Optimal operation of hoabinh reservoir for flood controlon hong-ThaiBinh river system
The findings shows that in the flood season 1996 if the operation of gates and outlets
of Hoabinh reservoir was made based on the calculated release, the water level at Hanoi
would be 12,3 m and the water level of Hoabinh reservoir would be 98 m. So the calculated
release from Hoabinh reservoir in August 1996 can be considered as optimal in the mean
that the water level at Hanoi can be controled and the Hoabinh reservoir stll have necessary
pool for controlling the next flood.
7 trang |
Chia sẻ: honghp95 | Lượt xem: 498 | Lượt tải: 0
Bạn đang xem nội dung tài liệu Optimal operation of hoabinh reservoir for flood controlon hong-ThaiBinh river system, để tải tài liệu về máy bạn click vào nút DOWNLOAD ở trên
Vietnam Journal of Mechanics, VAST, Vol. 30, No. 3 (2008), pp. 142 – 148
OPTIMAL OPERATION OF HOABINH RESERVOIR
FOR FLOOD CONTROLON HONG-THAIBINH
RIVER SYSTEM
Ngo Huy Can, Nguyen Thanh Don,
Nguyen Hong Phong, Nguyen Tuan Anh
Institute of Mechanics, VAST, Vietnam
Nguyen Van Que
Airdefence and Airforce Academy
Abstract. In the paper the optimal operation of Hoabinh reservoir for flood control on
Hong – Thaibinh river system is presented. The finddings show that in the flood season
in 1996 if the operation of gates and outlets of Hoabinh reservoir was made base on
the calculated release , the water level at Hanoi would be 12,3 m and the water level of
Hoabinh reservoir would be 98 m. So the calculated release from Hoabinh reservoir in
August 1996 can be considered as optimal in the mean that the water level at Hanoi can
be controlled and the Hoabinh reservoir still have necessary pool for controlling the next
floods.
1. INTRODUCTION
Optimal operation of reservoirs system for flood control on Hong – Thaibinh river
system is a big and complicated problem. In this article the optimal operation of Hoabinh
reservoir for flood control on Hong – Thaibinh river system is considered. A linear pro-
gramming model developed in [1] is applied here for the case of Hoabinh reservoir. It seems
to be that the reservoir operation leading from this study is more optimal than the one
performed in the flood occurred in 1996 [1], [2], [3].
2. MATHEMATICAL MODEL
The upstream of the Hong river consists of 3 rivers: Da , Thao and Lo. (Fig. 1)
The flow in Da river contributes a significant part to flow in Hong river (In flood
season 1996 the flow in Da river is about 70% total flow in Hong river). So up to now the
Hoabinh reservoir plays a very important role in flood control on Hong -Thaibinh river
system.
We consider the simple model schematic, which simulate the flow from Tabu to ThaoDa
confluence. (Fig. 2)
The Hoabinh reservoir is divided into 2 zones, the lower S1 and the upper S2
S =
2∑
l=1
Sl.
Optimal operation of Hoabinh reservoir for flood controlon Hong - Thaibinh river system 143
Fig. 1. The upstream of Hong river
Fig. 2. Model schematic of Hoabinh reservoir
The continuity equation for Hoabinh reservoir and the continuity equation for control
at the Thao Da confluence can be written as following: (See [1])
1
∆t
[
2∑
l
Si,l −
2∑
l
Si−1,l
]
= Ii − fi (1)
C1fi−1 +C2fi +C3hi−1 − hi = 0, (2)
144 Nguyen Tien Cuong and Trinh Thu Phuong
where Si: storage of l zone of Hoabinh reservoir, Ii: Inflow discharge to Hoabinh reservoir
at moment i, fi - The discharge below Hoabinh reservoir. It is the total release from
Hoabinh reservoir, hi - the discharge at control point at Thao Da, Ci: linear coefficient to
route period t flow from Hoabinh reservoir to control point at Thao Da confluence. Ci are
found directly from the Muskingum model.
The storage in each zone l of the Hoabinh reservoir is constrained as:
Si1 ≤ Smax 1, (3)
Si2 ≤ Smax 2. (4)
In order to sure that storage in zone 1 is filled before water is stored in zone 2, it is
necessary to add binary variables and logical constrains:
Si1 − Yi.Smax1 ≥ 0,
Si2 − Yi.Smax2 ≤ 0,
Yi ∈ {0, 1}.
(5)
The maximum release from Hoabinh reservoir is limited by the hydraulic properties
of the reservoir outlet works:
fi ≤
1
2
β1(S1i + S1i−1) +
1
2
β2(S2i + S2i−1), (6)
where: βl is the slope of the storage discharge capacity relationship in storage zone l.
Finally, the discharge at Thao Da confluence is smaller the discharge that may cause
the danger situation for Hanoi.
hi ≤ hmax. (7)
The objective function of the problem is developed by penalty function
SP → Min, (8)
where SP is the penalty function for too much or too little storage outside of a target
range of each zone.
For the Hoabinh reservoir the penalty function SP is built as in Fig 3.
Fig. 3. Storage penalty function
Optimal operation of Hoabinh reservoir for flood controlon Hong - Thaibinh river system 145
The storage at the point A is the drought pool of Hoabinh reservoir (At the point
A water level is 82 m). In the interval OA the penalty function decrease as the storage
increase. It is better as the storage in this interval is greater.
The storage from point A to point B is the conservative pool of Hoabinh reservoir, in
the interval. AB the penalty function equal zero because the storage change in this interval
do not cause any harm for flood control capacity (From the master reservoir regulation
manual).
The storage from point B to point C is the flood control pool (At the point C water
level is 117 m). The flood control capacity is better in this interval as the storage is smaller.
So the penalty function can be supposed linear increase as the storage increase.
In the article we consider the reservoir operation for flood control on the downstream
flow , so only the storage S1, S2 are used . (S1: the storage at point B. It is the drought
pool plus conservative pool, S2: the storage from B to C. It is the flood control pool of
Hoabinh reservoir)
So the problem can be formulated as following:
With the known inflow Ii to Hoabinh reservoir, find the optimal release fi from the
reservoir in the mean that the penalty function achieve minimum.
SP → min (9)
and the constrains (1)-(7) are satisfied
3. OPTIMAL RELEASE FROM HOABINH RESERVOIR
The program developed by the model is used to find the optimal operation of Hoabinh
reservoir for flood control on Hong-Thaibinh river system in flood season 1996. It means
that with the known inflow to the Hoabinh reservoir in the August 1996, release from
the reservoir is found, so that the storage S2 is minimum and the discharge at Thao Da
confluence is smaller the discharge that may cause the danger situation for Hanoi.
For this purpose the following data are used:
The inflow discharge to Hoabinh reservoir in August 1996 (From 7 August to 31
August) (Fig 4.)
Fig. 4. Inflow discharge to Hoabinh reservoir in August 1996
146 Nguyen Tien Cuong and Trinh Thu Phuong
Fig. 5. Measurement and calculation release from Hoabinh reservoir in August 1996
Fig. 6. Measurement and calculation discharge at Thao Da confluence in August 1996
The storage of Hoabinh reservoir:
Smax1=6109*10
6 m3,
Smax2=3762*10
6 m3.
The Muskingum coefficients to flow from Hoabinh reservoir to control point at Thao
Da confluence:
C1 =
∆t− 2KX
2K(1−X) +∆t
, C2 =
∆t+ 2KX
2K(1−X) +∆t
,
C3 =
2K(1−X)−∆t
2K(1−X) +∆t
, K =
0.5∆t[(Ij+1 + Ij)− (Qj+1 +Qj)]
X(Ij+1 − Ij) + (1−X)(Qj+1 −Qj)
,
where X : coefficient, K: coefficient, ∆t: Time step, Ij: Inflow at time step i, Qj: Outflow
at time step i, Ij+1: Inflow at time step i+ 1, Qj+1: Outflow at time step i+ 1.
Optimal operation of Hoabinh reservoir for flood controlon Hong - Thaibinh river system 147
Fig. 7. Measurement and calculation water level of Hoabinh reservoir in August 1996
Fig. 8. Calculation of water level at Hanoi in August 1996
The discharge at ThaoDa confluence is not greater than 13000m3/s. Calculated result
by themodel andmeasurement data for the flood occurred in 1996 are presented in Figs. 5-8.
The measurement and calculation release from Hoabinh reservoir are given in Fig. 5.
The measurement and calculation discharge at Thao Da confluence in the Ausgust 1996
are given in Fig. 6. The measurement and calculation water level of Hoabinh reservoir in
the August 1996 are given in Fig. 7. By the software I_MECH 1D we see that with the
calculated total release from Hoabinh reservoir the water level at Hanoi is not greater than
12.3 m (Fig. 8).
4. CONCLUSION
The findings shows that in the flood season 1996 if the operation of gates and outlets
of Hoabinh reservoir was made based on the calculated release, the water level at Hanoi
would be 12,3 m and the water level of Hoabinh reservoir would be 98 m. So the calculated
release from Hoabinh reservoir in August 1996 can be considered as optimal in the mean
148 Nguyen Tien Cuong and Trinh Thu Phuong
that the water level at Hanoi can be controled and the Hoabinh reservoir stll have necessary
pool for controlling the next flood.
ACKNOWLEDGMENT
The supports of the research in natural sciences and the project KC-08 are acknowl-
edged
REFERENCES
1. David W. Watkins, Jr Jason T. Needham, Jay R.Lund, S.K.Nanda, Linear programming for
flood control on the Iow and Des Moines rivers, Journal of water resources planning and
management 124 (2000) (3) 118-127.
2. Lund, J. R. and Ferreira, Operating rule optimization for Missouri River Reservoir System,
Journal of Water Resources Planning and Management 122 (4) (1996) 287-295.
3. Nilwiadomska-Szynkiewics, FC-MWS, A software environment for flood operation in Mul-
tireservoir system, Acta Geophysica Polonica 52 (1) (2004) 91- 103.
Received January 10, 2007
ĐIỀU HÀNH TỐI ƯU HỒ HOÀ BÌNH
Trong bài báo này việc điều hành tối ưu hồ Hoà Bình để kiểm soát lũ trên hệ thống sông Hồng
Ọ Thái Bình được nghiên cứu. Kết quả chỉ ra rằng trong cơn lũ tháng 8 năm 1996 nếu các cửa xả
hồ Hoà Bình được điều hành mở theo lượng xả tính toán thì mực nước tại Hà nội đạt 12,3 m còn
mực nước hồ Hoà bình đạt 98 m. Như vậy có thể coi lượng xả từ hồ Hoà bình này trong tháng 8
năm 1996 là tối ưu theo nghĩa là kiểm soát được mực nước ở Hà nội và hồ Hoà Bình còn khả năng
kiểm soát các cơn lũ tiếp theo.