From that situation, together with limitations in the quality management of construction contractors,
the article mentioned the responsibilities and obligations of the concerned parties in order
to improve the efficiency of the engineering quality management work. In general, in
order to achieve traffic works with criterion of low cost, fast progress, technical quality
assurance, there should be good coordination between the parties, including owner,
design consultant and construction contractor.
8 trang |
Chia sẻ: huongthu9 | Lượt xem: 551 | Lượt tải: 0
Bạn đang xem nội dung tài liệu Quality management of transport engineering constructions in vietnam responsibilities and obligations of related parties, để tải tài liệu về máy bạn click vào nút DOWNLOAD ở trên
Trường Đại học Vinh Tạp chí khoa học, Tập 47, Số 1A (2018), tr. 27-34
27
QUALITY MANAGEMENT OF TRANSPORT ENGINEERING
CONSTRUCTIONS IN VIETNAM
RESPONSIBILITIES AND OBLIGATIONS OF RELATED PARTIES
Nguyen Thi Thu Hang
Department of Civil Engineering, Vinh University
Received on 12/3/2018, accepted for publication on 10/5/2018
Abstract: Management of transport engineering construction quality is a very
serious problem in need of attention in Vietnam today. This determines the quality,
progress and cost of construction of works. This article deals with the responsibilities,
obligations, and coordination of the relevant parties, including owner, contractor,
design consultant, and construction supervision consultant in the field of transport
engineering construction quality.
1. Introduction
Traffic is the backbone of the whole social-economic system. Under the condition
that Vietnam is on the path of development, the improvement of transport system plays a
very special role. The fact indicates that rapidly urbanized regions have a faster
economic growth, higher population density and higher building density. As such, the
role of construction managers is increasingly recognized as an indispensable factor for
the development and assurance of quality of the transport engineering system.
The development of the technical infrastructure system in Vietnam is completely
spontaneous and does not meet the requirements of urban development [2]. The process
of construction of traffic works involves five key aspects, including quality, safety, cost,
construction schedule, and the environment. Poor management in construction of traffic
system will result in many other factors, such as bad and non- synchronized technical
infrastructure system quality, delayed project progress, increased costs, polluted
environment and occupational accidents [2].
In the construction period, quality management at the construction site includes
the quality management supervision of three subjects as the owners, the contractor and
the design consultant organization. The responsibilities of contractors who supply
materials and equipment for the construction of works are also mentioned.
At present, the investment capital for transportation infrastructure is more and
more limited; the state budget can only meet a small part, so that it must mobilize other
social resources [1], while traffic works are under requirement of highly technical
specification and time-consuming construction. Construction of traffic work completely
depends on the weather and is more complex than that of civil engineering or industrial
construction.
Currently, there are not many studies on quality management of traffic works in
Vietnam [1]. This article emphasizes the responsibilities and obligations of the relevant
parties, from that, to propose solutions for improving the quality management of traffic
works.
Email: nguyenthithuhang@vinhuni.edu.vn
N. T. T. Hang / Quality management of transport engineering constructions in Vietnam - responsibilities
28
2. Current situation of quality management of traffic works in Vietnam
Vietnam is on the innovation impetus in all aspects, in which transport
infrastructure is the main face of the country. There were many high quality traffic
projects such as the overpass 46 in Vinh City, Nghe An Province which is "an project of
international stature constructed in a very short time and well-controlled quality". In
addition, there were many small and large projects built with high quality to meet
development demand of society.
In order to get the results above mentioned, firstly, Vietnam has been establishing
and perfecting the quality of technical normative documents system towards regional and
international integration to become a engineering quality management tool [7]. The
second is that the team of builders has developed their specialty and experience towards
professionalization and specialization quickly. This is the direct element creating more
and more high quality building products.
Figure 1: Overpass 46B was completed 9 months earlier than the propsed progress
(From:
In addition to the above-mentioned achievement, the work of quality control in
the construction of traffic works is still limited. Statistics from the Ministry of
Transportation show that 25% of the projects violates the stage of investment preparation
and project approval; more than 32% of the projects violates in design consultancy work;
20% of the projects violates the tender regulations; more than 23% of the projects
violates the supervision consultancy; and 25% of the projects violates the acceptance
work, payment and investment capital [8].
Specific limitations are as follows:
2.1. Improper contractor selection
Many holding corporations have their subsidiaries operating in the same field. In
fact, such subsidiaries often use the capacity of their holding corporation for tendering
but use their own capacity for actual implementation. As a result, in many cases human
resources and financial capacity of a subsidiary does not ensure the construction progress
and construction quality. It is inevitable that personnel who take part in field work are not
Trường Đại học Vinh Tạp chí khoa học, Tập 47, Số 1A (2018), tr. 27-34
29
the same personnel proposed in the tender documents. On the other hand, a subsidiary
must be independent in its financial capacity so during the construction process, material
reserve is difficult.
The personnel of a contractor are not arranged as in the tender with faulty
workmanship, not enough internal supervisors, even to leave work to construction team’s
discretion resulting in poor construction quality.
During the construction process, a contractor has not yet deployed a quality
management system according to the scale of the work. Stipulation of the responsibilities
of each individual and each section for the quality management of construction works is
not attached special importance. The inspection and testing of materials, structures,
materials and equipment before construction according to standards, requirements of
design and construction contracts are still only formality and countermeasure.
Bidding document of the almost contractors are unclear on the type of materials
used for the works but only indicating a series of firms that are "equivalent". This is not
contrary to regulations but creating many legal loopholes, making difficulty in
management of the procurement resulting in poor quality of construction.
2.2. Unsound investor’s responsibilities
Representatives of an investor always must arrange at least one person at the site
to participate in monitoring with the supervision consultant. However, in reality,
representatives of an investor in field have not fully developed his capacity and
authority. Investor’s supervisor’s capacity is bad and supervision consultant is
irresponsible; this results in poor construction quality. The acceptance process is not
close due to supervisor of an investor and supervision consultants do not have a
thorough understanding of the acceptance process.
The project for consolidation and improvement of the section through Nam Dan
to Nghe An town: construction without job superintendent, supervision, signs, protection,
and safe system (figure 2).
Figure 2: Building without signs and barriers
(From:
N. T. T. Hang / Quality management of transport engineering constructions in Vietnam - responsibilities
30
2.3. Poor shopping management
Materials and equipment to be supplied for construction do not meet the
general technical requirements as indicated in bidding document, and are not high-
quality items.
The East-West Highway, from the tunnel crossing the Saigon River to Cat
Lai overpass, is about 6.5 km long and officially operated from 20
th
November
2011, but due to many reasons, after half a year, East-West Highway pavement
has been degraded and, sunk deeply resulting in dangerous situation for truck
drivers (figure 3).
Figure 3: Road from Giong Ong To bridge to Luong Dinh Cua highway
(From:
2.4. Low design quality
Design consultants and verification consultants are irresponsible, making
wrong estimates, lacking quantity and work; At once, contractors does not check
again the executed work quantity resulting in import of many material but not
used up so that material is stored in warehouse for replacement in case of damage
or repair. This is also wasteful. The design is not exact to the actual field, or
wrong geological prediction. This results in design changes. These design changes
are often treated slowly, about 3-6 months for their design.
3. Improving the efficiency of construction quality management of
traffic works in Vietnam - responsibilities and obligations of related parties
Construction quality management of engineering works consists of
activities of units in charge of management of investor and construction
contractor through measures such as quality planning, quality control, quality
assurance and quality improvement of construction [6]. Quality management of
the works includes all functional activities of investor and contractor such as
preparation and approval of construction measures, supervision of works during
Trường Đại học Vinh Tạp chí khoa học, Tập 47, Số 1A (2018), tr. 27-34
31
the investment implementation or work acceptance, quality inspection of the
works during the termination of investment (figure 4).
Figure 4: Construction quality management diagram
In the construction market, quality of works is formed through the long
production process with the participation of many people and units, so that it is necessary
to clearly define the scope of specific responsibilities for each party. The assignment of
responsibilities is stipulated by economic contracts, based on the principle of
voluntariness and negotiation. But all voluntary agreement must be in accordance with
the regulations of the State. These are legal documents on management of investment and
construction, standards and construction specifications. Each party involved in the
construction process must have the necessary capacity to perform the job, whether it is a
design consultant, construction contractor or owner's supervisor.
3.1. Responsibilities of an Investor
- Selecting organizations and individuals who are qualified according to
regulations to perform the construction of works, supervising the construction of works,
testing and inspecting the quality of works and works and other construction consultancy.
- Informing about tasks and powers of individuals in the quality management
system of an investor and the construction supervision contractor to the contractors
concerned for coordinated implementation
- Checking the suitability of construction contractors' capability comparing with
bidding document and construction contracts, including: manpower, construction
INVESTOR
Select
construction
contractor
Establish and
approve
construction
measure
Check
commencement
condition and
report to state
management
agency
Organize
construction,
supervision,
acceptance
Check
engineering
quality,
construction
items
Check
acceptance
work
Make
document
for archive
TRANSPORT ENGINEERING
CONSTRUCTION CONTRACTOR
Period of
investment
execution
Period of
investment
finish
N. T. T. Hang / Quality management of transport engineering constructions in Vietnam - responsibilities
32
equipment, specialized construction laboratories, quality management systems of
construction contractor.
- Checking the mobilization and arrangement of manpower resources of
construction supervision contractors comparing with the requirements of construction
contracts [3].
- Inspecting and supervising during the construction process, including:
+ Checking materials, components, construction products, equipment installed in
the works; Carrying out quality control tests when necessary;
+ Checking construction methods, which clearly specify the measures to ensure
safety for people, machines, equipment and works of construction contractors;
+ Inspecting, urging and supervising the work construction contractor and other
contractors to carry out work in the field;
+ Requesting design contractors to adjust in case of having errors, unreasonable
design.
- Complying with the regulations on environmental protection for construction
works in accordance with the law on environmental protection.
- Organizing verification of the quality of construction items and all construction
works when there are doubts about the quality or in case having requirement of the State
management agencies.
- Organizing acceptance of construction works.
- Organizing establishment of completion document of construction works.
- Postponing or suspending construction of construction contractors when it is
considered that construction quality does not meet the technical requirements and
construction methods are not safe.
- Presiding, combining with concerned parties for treating and overcoming
problems which is difficult or arose in the course of construction of works.
- Making reports on the completion of the construction works for operation or
making unscheduled reports upon the request and sending to the state management
agencies in charge of construction.
3.2. Responsibilities of construction contractors
- Setting up a quality management system in line with the scale of works, to
define the responsibilities of each individual and each section for the quality management
of construction works.
- Assigning responsibility for quality management of construction works between
the parties in case of application of the form of general construction contractors, general
design and construction contractor, general design contractor, general contractor of
technological and construction equipment supply, general contractors of establishment of
investment projects and other forms of general contractors (if any).
- Receiving and managing construction sites, preserving site located marks and
landmarks.
- Preparing and approving the construction measures, which clearly stipulate the
measures to ensure the safety of people, machines, equipment and construction schedule,
unless otherwise stipulated in the contract.
Trường Đại học Vinh Tạp chí khoa học, Tập 47, Số 1A (2018), tr. 27-34
33
- Carrying out the inspection and testing of materials, structures, materials and
equipment of works and technological equipment prior to construction and installation
into construction works in accordance with the standards and requirements of the design
and requirements of the construction contract [5].
- Carrying out construction in accordance with the construction contract,
construction permit, design drawings to ensure quality of the works and safety in
construction.
- Timely notifying investor of discrepancies between design drawings, contract
documents and site conditions.
- Correcting errors and defects in the quality for executed works; To assume and
combine with the investor in overcoming the consequences of incidents in the work
construction process; Making report in incidents and combining with relevant parties to
assess the causes of the incidents.
- Making the construction schedule according to regulations.
- Making as-constructed drawing according to regulations.
- Reporting to investor on progress, quality, quantity, work safety and
environmental sanitation at the investor’s request [5].
- Returning the plane, moving the materials, machinery, equipment and other
assets out of the construction site after the works have been accepted and handed over,
unless otherwise agreed in the contracts.
3.3. Responsibilities of contractors in charge of manufacturing, producing and
supplying materials, products, equipment, components used for construction works
- Ensuring the quality of materials, products, equipment and construction
components according to national technical standards, meeting the design requirements.
- Providing the investor with full information and documents related to the
products and goods under the provisions of the Law on product and goods quality and
other relevant laws, ensuring the stipulation on label of the product.
- Executing agreements with the investor on the process and methods of
inspection of the materials, products, equipment and construction component quality
before and during the production process as well as in the process of supply, use and
installation.
3.4. Responsibilities of construction supervision contractors
- Appointing a qualified person to perform the duties of the chief supervisor and
other supervisory positions.
- Making organization diagram and terms of reference of supervision, including
duties, powers and obligations of supervisory titles, to make plan and procedure of
quality control, inspection, acceptance, method of management of relevant files and
documents in the process of construction supervision.
- Carrying out construction supervision in accordance with the law on quality
control of construction works.
4. Conclusion
Starting from the reality in Vietnam, transport construction contractors are on the
path of specialization and professionalism, so the application of models of international
N. T. T. Hang / Quality management of transport engineering constructions in Vietnam - responsibilities
34
modern quality management systems is really not appropriate and formalistic. From that
situation, together with limitations in the quality management of construction contractors,
the article mentioned the responsibilities and obligations of the concerned parties in order
to improve the efficiency of the engineering quality management work. In general, in
order to achieve traffic works with criterion of low cost, fast progress, technical quality
assurance, there should be good coordination between the parties, including owner,
design consultant and construction contractor.
REFERENCES
[1] Tran Hoe, Report on solutions for quality management of construction works in
November 2003, 2003.
[2] Trinh Quoc Thang, Science and construction organization, Construction Publishing
House, Hanoi, 2005.
[3] Trinh Quoc Thang, Project Consultant and Construction Supervision Consultant,
Construction Publishing House, Hanoi, 2010.
[4] Decree No. 12/2009/ND-CP dated 10/02/2009 of the Government on management of
construction investment projects.
[5] Decree No. 46/2015/ND-CP dated 12/05/2015 of the Government on quality
management and maintenance of construction works.
[6] Dinh Tuan Hai, Construction Project Management, Construction Publishing House,
Hanoi, 2012.
[7] Le Kieu, Organization of Construction, Hanoi Architectural University, 2006.
[8] The Ministry of Transport, Year-End Summary Report, 2016.
TÓM TẮT
QUẢN LÝ CHẤT LƯỢNG THI CÔNG XÂY DỰNG CÔNG TRÌNH
GIAO THÔNG TẠI VIỆT NAM - TRÁCH NHIỆM VÀ NGHĨA VỤ
CÁC BÊN LIÊN QUAN
Quản lý chất lượng thi công xây dựng công trình giao thông đang là vấn đề nóng
cần được quan tâm hiện nay tại Việt Nam, nó quyết định đến chất lượng, tiến độ và giá
thành xây dựng của công trình. Bài báo này đề cập đến trách nhiệm, nghĩa vụ và sự phối
hợp giữa các bên liên quan bao gồm: chủ đầu tư, nhà thầu thi công, tư vấn thiết kế, tư vấn
giám sát công trình trong lĩnh vực quản lý chất lượng công trình.
Các file đính kèm theo tài liệu này:
- quality_management_of_transport_engineering_constructions_in.pdf